NEW QUESTION 36
Elaine is the project administrator for the Finance project.
The team requests a brand new field called Currency. It must be added to the screen used on the Approval transition. How can these requirements be met?

  • A. Elaine can create the field but a Jira administrator must add it to the screen.
  • B. A Jira administrator must create the field and add it to the screen.
  • C. A Jira administrator must create the field but Elaine can add it to the screen.
  • D. Elaine can create the field and add it to the screen.

Answer: B

Explanation:
You will be taken directly to the Configure Screen page, where you can add fields to your new screen

 

NEW QUESTION 37
Scrum Masters must be able to manage sprints in a particular project, but they are unable to do so You need to recommend an action to the Jira administrator which satisfies their requirement. Which recommendation will definitely NOT satisfy their requirement?

  • A. Add the Scrum-Masters project role to the Manage Sprints permission
  • B. Add the Scrum-Masters group to the Manage Sprints permission
  • C. Add individual users to the Scrum-Masterproject role
  • D. Add Application access (Jira Core) to the Manage Sprints permission

Answer: C

 

NEW QUESTION 38
Martina is unable to perform the following actions in the App project:
* Create and manage versions
* Create and manage components
* Rank issues in the backlog
The App project does not use a shared permission scheme.
Which two permissions will allow her to perform those actions? (Choose two.)

  • A. Move Issues
  • B. Schedule Issues
  • C. Bulk Change
  • D. Transition Issues
  • E. Administer Projects

Answer: B,E

 

NEW QUESTION 39
John needs to configure an Issue Collector where he is the reporter of all the collected issues.
Which two permissions does he need to do this? (Choose two.)

  • A. Assignable User
  • B. Create Issues
  • C. Transition Issues
  • D. Administer Projects
  • E. Add Comments

Answer: B,D

 

NEW QUESTION 40
Analyze the workflow scheme for the SSP project shown below:

Which change would require an update to the workflow scheme?

  • A. Sub-task and Bug need a different set of statuses.
  • B. Story and Task need a different screen when being created.
  • C. Task and Sub-Task need a different screen when being edited.
  • D. Story and Epic need a different set of statuses.

Answer: A

 

NEW QUESTION 41
The Jira administrator has just created a new project based on the Task management project template.
Which Jira feature will be available in this project by default?

  • A. Epic issue type
  • B. Ranking of standard issue types
  • C. Release Hub
  • D. Issue security levels
  • E. Issue analysis reports

Answer: B

Explanation:
Explanation/Reference: https://confluence.atlassian.com/jiracoreserver070/task-management-777015801.html

 

NEW QUESTION 42
Nadav wants to know how accurate estimates were on issues associated with version 2.2 Which report should he use?

  • A. Time Tracking Report
  • B. Single Level Group By Report
  • C. Resolution Time Report
  • D. Time Since Issues Report
  • E. Version Workload Report
  • F. User Workload Report

Answer: A

 

NEW QUESTION 43
An extract of a permission scheme is shown below.

Jennifer Evans needs to be able to:
* Manage project role membership
* Log time to issues
What is the minimum number of project roles she needs?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: D

 

NEW QUESTION 44
An extract of a permission scheme is shown below

Jennifer Evans needs to be able to.
*Manage project rote membership
*Log time to issues
What is the minimum number of project roles she needs?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: D

 

NEW QUESTION 45
You work for an insurance company and want to use Jira for tracking customers and their contracts. Before requesting a new project you have gathered some requirements:
* Each customer can have multiple contracts.
* Each contract can have an independent status.
* Each contract will be worked on by a different agent.
* Contracts cannot exist without a corresponding customer.
How should contracts be configured?

  • A. as workflow statuses
  • B. as fields on a screen
  • C. as sub-task issue types
  • D. as tabs on a screen

Answer: A

 

NEW QUESTION 46
Nadav wants to know how accurate estimates were on issues associated with version 2.2.
Which report should he use?

  • A. Single Level Group By Report
  • B. Resolution Time Report
  • C. Time Since Issues Report
  • D. User Workload Report
  • E. Version Workload Report
  • F. Time Tracking Report

Answer: D

 

NEW QUESTION 47
All projects use a simplified workflow which has three statuses (Open, In Progress, Closed) and all global transitions You need to find issues which were never In Progress Select the correct JQL query.

  • A. Status ONLY IN (Open, Closed)
  • B. Status NOT Changed TO "In Progress"
  • C. Status WAS NOT "In Progress"
  • D. Status i= "In Progress"
  • E. Status WAS Open OR Status WAS Closed

Answer: C

 

NEW QUESTION 48
Malik is a project administrator tor the HR project
He cannot remove the Fix Version/s field from the HR project screen
Why is he NOT able to do this?

  • A. The Fix Version/s field is locked
  • B. System fields cannot be removed from screens
  • C. Fix Version/s for the project have been archived
  • D. The screen is used by another project
  • E. Fix Version/s is a required field

Answer: E

 

NEW QUESTION 49
You are the project administrator for a Software Scrum Project.
Time Tracking is globally enabled
Identify the reason why users are NOT able to log work

  • A. Issue estimation on the Scrum board is set to Story points instead of Onginal Estimate
  • B. The Log Work field is not present on any project screens.
  • C. The issues do not have an Original Estimate
  • D. The users do not have the Work On Issues permission
  • E. Time Tracking on the Scrum board is set to None

Answer: B

 

NEW QUESTION 50
You want a built-in report that meets these requirements:
* shows the results of a saved filter
* groups the results by priority and shows a progress bar for each priority
* displays issue status and resolution
Which report should you use?

  • A. Single Level Group By Report
  • B. Created vs. Resolved Issues Report
  • C. Resolution Time Report
  • D. Recently Created Issues Report
  • E. Time Tracking Report
  • F. User Workload Report

Answer: D

Explanation:
Recently Created Issues
The Recently Created Issues Gadget displays a bar chart showing the rate at which issues are being created, as well as how many of those created issues are resolved.
Reference: https://confluence.atlassian.com/jirakb/reporting-in-jira-461504615.html

 

NEW QUESTION 51
......

Exam Questions and Answers for  ACP-600 Study Guide Questions and Answers!: https://actualtests.vceengine.com/ACP-600-vce-test-engine.html