To become a certified quality engineer, candidates must meet certain eligibility requirements and pass the CQE exam. CQE exam consists of 175 multiple-choice questions that cover various topics related to quality engineering, including statistical methods, quality management systems, product and process design, and reliability and maintainability. The CQE certification is recognized worldwide and is highly valued by employers in many industries, including manufacturing, healthcare, and service industries. It is a great way for quality professionals to demonstrate their expertise and commitment to excellence in their field.


ASQ CQE (Certified Quality Engineer) Certification Exam is a globally recognized certification for quality engineers. Certified Quality EngineerExam certification is designed to validate the competence and expertise of quality engineers in various industries. Certified Quality EngineerExam certification is offered by the American Society for Quality (ASQ), a professional association that provides training and certification for quality professionals worldwide.

 

NEW QUESTION # 35
In a value stream analysis, inspection is typically classified as

  • A. non-value added
  • B. real value added
  • C. customer value added
  • D. organizational value added

Answer: A

Explanation:
In value stream analysis, inspection is typically classified as non-value added. This is because inspection does not directly transform the product or add value from the customer's perspective. Instead, it is an activity that checks for defects or issues, which ideally should be prevented by improving the processes.
References:
* Rother, M., & Shook, J. (1999). Learning to See: Value Stream Mapping to Add Value and Eliminate MUDA. Lean Enterprise Institute.
* Liker, J.K. (2004). The Toyota Way: 14 Management Principles from the World's Greatest Manufacturer. McGraw-Hill.


NEW QUESTION # 36
Reliability prediction is
I. The process of performance estimation.
II. The process of estimating the probability that a product will perform its intended function for a stated time.
III. The process of telling "how you can get there from here".

  • A. II only
  • B. II and III only
  • C. I only
  • D. I, II and III

Answer: A


NEW QUESTION # 37
The pre-production or pre-service planning process should include which of the following activities?

  • A. Certification of suppliers
  • B. Implementation of process quality audits
  • C. Preparation of product and process control plans
  • D. Development of cost of quality parameters

Answer: C

Explanation:
The pre-production or pre-service planning process should include the preparation of product and process control plans. These plans outline the necessary steps and controls to ensure that the product meets quality requirements and that the process is capable of producing consistent results.References:
* ASQ Quality Press: The Certified Quality Engineer Handbook.
* Quality Planning and Analysis by J.M. Juran and Frank M. Gryna.


NEW QUESTION # 38
Which of the following tools should be used to break a broad goal into increasingly detailed levels?

  • A. Matrix diagram
  • B. Interrelationship digraph
  • C. Affinity diagram
  • D. Tree diagram

Answer: D

Explanation:
A tree diagram is a tool used to break down broad goals into increasingly detailed levels. It starts with a central concept and branches out into finer levels of detail, similar to the structure of a tree. This helps in understanding the various components of a goal and how they relate to one another, facilitating a step-by-step approach to achieving the objective.
References:
* ASQ (American Society for Quality). (n.d.). Tree Diagram. Retrieved from
https://asq.org/quality-resources/tree-diagram
* Tague, N.R. (2004). The Quality Toolbox. ASQ Quality Press.


NEW QUESTION # 39
A company decides to adopt a total quality system and has started the process by developing quality policies.
Rank in order, from first to last, the rest of the steps that need to be performed to implement this system.
1.Audit the system
2.Determine system requirements
3.Develop a measurement system
4.Perform continuous improvement activities
H Calculator

  • A. 3, 2.4. 1
  • B. 2, 1,3.4
  • C. 3,4, 1,2
  • D. 2, 3, 1,4

Answer: D

Explanation:
To implement a total quality system, the steps should be performed in the following order:
* Determine system requirements (2)
* Develop a measurement system (3)
* Audit the system (1)
* Perform continuous improvement activities (4)
This sequence ensures that the system's needs are identified first, followed by the establishment of metrics to measure performance. Auditing verifies compliance and effectiveness, and continuous improvement ensures ongoing enhancement of the quality system.


NEW QUESTION # 40

A in this drawing, the symbol is being used to indicate the

  • A. reference plane
  • B. basic definition
  • C. feature
  • D. datum

Answer: D

Explanation:
In the provided drawing, the symbol marked "A" is being used to indicate a datum. A datum is a reference point, line, or surface used as a basis for measurement and to establish the location or orientation of other features. It serves as a starting point for dimensional control and ensures consistency in the manufacturing process.


NEW QUESTION # 41
A comprehensive corrective action program is initiated at a large company. Input for CARs are received from customers, internal and external audits, material review reports and other sources. Which two of the following groups would usually administer and control the CAR process?
. Management review team.
. Quality department.
. Corrective Action Board.
. Material Review Board.

  • A. III and IV only
  • B. II and III only
  • C. I and III only
  • D. I and II only

Answer: C


NEW QUESTION # 42
What distribution is used to determine the OC curve for an attributes sampling plan?

  • A. Binomial.
  • B. Exponential.
  • C. The binomial or the hypergeometric distribution.
  • D. Normal.

Answer: C


NEW QUESTION # 43
A normal (Gaussian) distribution curve is

  • A. Pear shaped.
  • B. Positively skewed.
  • C. Bell shaped.
  • D. Dome shaped.

Answer: C


NEW QUESTION # 44
Which of the following is a valid null hypothesis?

  • A. p > 1/8
  • B. μ < 98
  • C. The mean of population A is not equal to the mean of population B
  • D. mu = 110

Answer: D


NEW QUESTION # 45
In most cases, an improvement team facilitator will NOT normally:

  • A. Function as the group leader.
  • B. Provide feedback to the group.
  • C. Summarize key ideas generated by the group.
  • D. Be familiar with problem solving techniques.

Answer: A


NEW QUESTION # 46
Which of the following nondestructive testing methods can be used to evaluate sub-surface discontinuities in aluminum bar stock?
. Microwave.
. Magnetic particle.
. Pulse echo.
. Eddy current.

  • A. IIIandIVonly
  • B. I,IIandIVonly
  • C. I andIVonly
  • D. I andIIIonly

Answer: A


NEW QUESTION # 47
A lot is known to be 1.2% defective. Five units are randomly selected from the lot, and the lot is accepted if 1 or fewer defects are found. What is the probability of the lot being rejected?

  • A. 0.01
  • B. 0.00173
  • C. 0.9985
  • D. 0.00223

Answer: B

Explanation:
Explanation/Reference:


NEW QUESTION # 48
An incidental product characteristic is described as a characteristic that

  • A. fails to perform the intended function
  • B. meets most but not all of its intended functions
  • C. causes a critical failure
  • D. is transparent to the customer

Answer: D

Explanation:
An incidental product characteristic refers to a feature or aspect of a product that exists but is not necessarily intended or required by the customer and does not impact the primary function of the product.
* Meets Most but Not All of Its Intended Functions:
* Refers to a partially functional product characteristic, not incidental.
* Fails to Perform the Intended Function:
* Indicates a defective product characteristic.
* Causes a Critical Failure:
* Refers to a characteristic leading to a critical failure, not incidental.
* Is Transparent to the Customer:
* An incidental characteristic does not affect the product's primary function or customer satisfaction and may go unnoticed by the customer.
References: Product design and quality engineering principles.


NEW QUESTION # 49
What is the standard deviation of the values below?
4.5, 5.1, 6.2, 2.1, 3.9

  • A. 1.362
  • B. 2.087
  • C. 1.136
  • D. 1.522

Answer: A


NEW QUESTION # 50
A system was designed with 3 capacitors. When the system is first activated all capacitors are operating. The system continues to operate as long as at least 1 capacitor is operating. This is an example of

  • A. Redundancy.
  • B. A series system.
  • C. An active parallel system.
  • D. A standby parallel system.

Answer: C


NEW QUESTION # 51
......