
2026 Updated Verified C_P2W43_2023 dumps Q&As - Pass Guarantee or Full Refund
C_P2W43_2023 PDF Questions and Testing Engine With 82 Questions
NEW QUESTION # 49
Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question
- A. Cancel status Released.
- B. Change the pronty
- C. Change the estimated costs.
- D. Book a goods receipt.
Answer: B,D
NEW QUESTION # 50
The planner adds stock materials in the maintenance order. What are possible options for handling of reservations within a maintenance order? Note: There are 2 correct answers to this question
- A. Reservations are created only after a material availability check has been performed
- B. Open reservations can be cleared when a maintenance order operation is finally confirmed.
- C. All open reservations are closed when the maintenance order is set to TECO.
- D. For the combination of order type and planner group, you can decide when reservations are created
Answer: B,C
NEW QUESTION # 51
You schedule a Maintenance Service Plan. Which call object is generated?
- A. Customer Service Order with assigned DIP profile
- B. Maintenance Order which is linked to a Service Order Header
- C. Customer Service Order with an external order operation
- D. Maintenance Order which is linked to a Service Order Item
Answer: A
NEW QUESTION # 52
What can be determined using the offset within a maintenance strategy? Note: There are 2 correct answers to this question.
- A. The first due date of a maintenance package
- B. A one-time shift of a maintenance package
- C. A preliminary buffer shifting the reference date of the maintenance order
- D. The call date for the maintenance order
Answer: A
NEW QUESTION # 53
What do you have to consider when setting up phase-based maintenance?
- A. It is mandatory for breakdown and preventive maintenance.
- B. It can be used with any existing order type.
- C. It is not possible to configure the nine delivered phases.
- D. It comes preconfigured when using the relevant Best Practices scope items.
Answer: D
NEW QUESTION # 54
Which functions characterize a Strategic analysis as opposed to embedded analysis within the SAP S/4HANA core system? Note: There are 2 correct answers to this question
- A. A collection of tools that are not included with core SAP S/4HANA
- B. SAP Business Objects as a part of SAP Business Warehouse (BW)
- C. Preconfigured Core Data Service (CDS) containing SQL views
- D. SAP Business Objects Business Intelligence for Visualization
Answer: B,C
NEW QUESTION # 55
You want to create a maintenance order with an external order operation that includes service items.
How can you achieve this? Note: There are 2 correct answers to this question
- A. The assignment of a control key with the service indicator set is mandatory
- B. The usage of a model service specification is mandatory.
- C. The assignment of a control key with key externally processed operation is sufficient.
- D. The actual value entry can be recorded only via the service entry sheet
Answer: A,B
NEW QUESTION # 56
Which steps are available for the maintenance technician when using the Report Malfunction bile? Note: There are 3 correct answers to this question.
- A. Input estimated costs for repair malfunction
- B. Display the current location of the technical object
- C. Select and print the maintenance order shop papers
- D. Add a URL to provide further information
- E. View details of the technical object by navigating to the Asset Viewer
Answer: B,D,E
NEW QUESTION # 57
The maintenance technician wants to document work steps for a technical object in a notification. What are the best options to be used in regard to code-based reporting? Note: There are 2 correct answers to this question?
- A. A text in the subject long text screen
- B. A task in the notification item
- C. An entry in the object list
- D. An activity in the notification header
Answer: B,D
NEW QUESTION # 58
How can you assign a material BOM to a piece of equipment?
- A. Via creation of an equipment BOM
- B. Via field model number in the equipment master
- C. Via field construction type
- D. Via material BOM header in the serialization data
Answer: C
NEW QUESTION # 59
What do you need to configure to enable entries in the action log of a piece of equipment?
- A. Define the corresponding history related field for the equipment reference category.
- B. Define history related fields in the usage period customizing.
- C. Activate the change documents for the equipment reference category.
- D. Activate the change documents for the equipment category.
Answer: B,D
NEW QUESTION # 60
Which capabilities does SAP Service and Asset Manager (formerly SAP Asset Manager) provide? Note: There are 3 correct answers to this question
- A. SAP Service and Asset Manager can be used offline.
- B. SAP Service and Asset Manager is available only for the iOS platform.
- C. SAP Service and Asset Manager can run on smart watches.
- D. SAP Service and Asset Manager provides single sign-on functionality.
- E. SAP Service and Asset Manager is available for SAP S/4HANA and SAP ERP
Answer: A,D,E
NEW QUESTION # 61
You want to create a new functional location. Which selling is part of the Customizing for the functional location category? Note: There are 3 correct answers to this question
- A. Usage period
- B. Object information
- C. Status profile
- D. Warranty category
- E. Measuring point category
Answer: B,C,E
NEW QUESTION # 62
How does a maintenance request within the phase-based process differ from a maintenance notification in the standard process?
- A. It always uses the risk-based assessment for prioritization.
- B. It is a new business object with no connection to a maintenance notification.
- C. It contains an additional screening phase where requests can be accepted or rejected.
- D. It is mandatory to assign a task list to the maintenance request.
Answer: C
NEW QUESTION # 63
Which requirements have to be fulfilled so that an Inspection Checklist with Inspection Lots is generated? Note: There are 2 correct answers to this question.
- A. A checklist type must be assigned to the maintenance order header.
- B. An Inspection Plan and a technical object must be assigned to the same class.
- C. A PM task list with inspection point type must be assigned to the maintenance order
- D. An object list must have been generated manually or automatically.
Answer: B,C
NEW QUESTION # 64
What are mandatory characteristics of orders with Operation Account Assignment (OAA)? Note:
There are 3 correct answers to this question
- A. Costs are stored only for the operation object
- B. Purchase requisitions have the operation as account assignment.
- C. The settlement rule is maintained on the header level.
- D. A technical object must be assigned to an order operation
- E. Overall costs are dynamically summed up on the header level.
Answer: A,D,E
NEW QUESTION # 65
You want to display additional document information within the document flow of a maintenance order.
For which type of document must this be customized?
- A. Purchase order
- B. Invoice
- C. Goods movement
- D. Service entry sheet
Answer: C
NEW QUESTION # 66
Which of these are necessary steps of the Inspection Checklist process? Note: There are 2 correct answers to this question
- A. Link PM task list with assigned inspection point type to a maintenance item.
- B. Generate Inspection Lols within the checklists view.
- C. Record the usage decision for an Inspection Lot
- D. Generate Inspection Lots assigned to maintenance order headers.
Answer: C,D
NEW QUESTION # 67
You want to set up a scenario for regular maintenance. The first event should take place after 1 year, after that it is a regular cycle of 6 months. Which parameter do you have to use to map this in the system?
- A. Package hierarchy
- B. Scheduling indicator
- C. Cycle modification factor
- D. Maintenance package offset
Answer: D
NEW QUESTION # 68
You want to assign components to a General Maintenance Task List. What are prerequisites for assigning material components to a task list operation? Note: There are 2 correct answers to this question
- A. Assign the header material of a material BOM as assembly to a task list operation.
- B. Assign the header material of a material ROM to the assembly field of the task list header
- C. Assign the BOM usage for free assignment of material in Customizing
- D. Assign a piece of equipment with allocated material BOM to a task list operation.
Answer: A,C
NEW QUESTION # 69
What is the goal of embedded analytics in SAP S/4HANA?
- A. To integrate BW Info Cubes
- B. To integrate BW Data Store Objects
- C. To allow both tactical and strategic analyses within the S/4HANA core
- D. To combine transactional and analytical processing
Answer: D
NEW QUESTION # 70
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question.
- A. Scheduling period
- B. Start date
- C. Factory calendar
- D. Scheduling indicator
Answer: A,B
NEW QUESTION # 71
Which objects have been enhanced with linear data in maintenance processes? Note: There are 3 correct answers to this question
- A. Maintenance plan item
- B. Equipment task list
- C. Work order confirmation
- D. Notification item
- E. Maintenance plan header
Answer: A,C,D
NEW QUESTION # 72
Which of the following are components of cloud-based SAP Intelligent Asset Management? Note: There are 2 correct answers to this question
- A. SAP Service and Asset Manager (formerly SAP Asset Manager)
- B. SAP Work Manager
- C. Worker Safety applications
- D. SAP Asset Performance Management
Answer: A,D
NEW QUESTION # 73
In which maintenance object can you use an activity type? Note: There are 2 correct answers to this question.
- A. Work center
- B. Notification activity
- C. Maintenance order operation
- D. Maintenance order header
Answer: A,C
NEW QUESTION # 74
......
Exam Engine for C_P2W43_2023 Exam Free Demo & 365 Day Updates: https://actualtests.vceengine.com/C_P2W43_2023-vce-test-engine.html
